ÇIRAKDAMI HEPP

ÇIRAKDAMI HEPP

  • Özellikleri Çırakdamı Hydroelectric Power Plant is established on Aksu River in Giresun province, within the boundaries of Dereli district. The installed capacity is 50 MW and the annual average energy production is 160 million KWh. It was commissioned in 2012.