PLANTS IN
OPERATION
GÖKYAR HEPP
PROJECT
•
Located on the Dalaman stream, which originates
in the Denizli and Burdur provinces and flows into
the sea from within the boundaries of the
province of Muğla.
• Installed capacity of the power plant: 10,95 MW.
• Annual average output: 60 million kWh.
• The plant become operation on 05.05.2006.