PLANTS IN
OPERATION
FESLEK HEPP
PROJECT
•
Located on the Büyükmenderes river within the boundaries of
Nazilli, Aydın.
• Installed capacity of the power plant: 8,84 MW.
• Average annual output: 41 million kWh.
• The plant became operational on August 5, 2004.