Koyulhisar HEPP Project

• Currently being constructed on the Kelkit stream, which is located within the boundaries of
Koyulhisar, Sivas.

• Installed capacity of the power plant: 42 MW.

• Expected annual average output: 329 million kWh.

• A license has been obtained from the Energy Market Regulatory Authority and construction
works have begun.

• Planned to become operational in March 2008.

 